Would you like more information or assitance with viewing this property? Put a Highgarden Realtor® to work for you today. Call Phillip Stutts at 704-600-5424
905 Gantt St Kings Mountain, North Carolina 28086 MLS# 4267021
Welcome to your beautifully updated home— Refreshed from top to bottom for modern comfort and style with Spacious lot in quite neighborhood Step inside to discover brand-new windows that flood the home with natural light, creating a bright, airy atmosphere. The fully renovated bathrooms feature sleek, modern finishes, while the kitchen shines with new appliances and contemporary updates. You’ll appreciate the new flooring throughout, along with upgraded interior and exterior doors, and all-new hardware and fixtures for a cohesive, modern look. Updated plumbing and electrical systems, Outside, enjoy the convenience of a new gravel driveway and the charm of refreshed front and back porches—ideal for relaxing or entertaining. Topped off with a brand-new roof, this home is truly move-in ready. Don’t miss your chance to own a turnkey property in a great location!
Room Locations
Bathrooms